LAFCO 3281
.jpg?ixlib=rb-1.1.0&w=2000&h=2000&fit=max&or=0&s=35d9e62b6dcee5bc4d86919bd9398dc1)
Reorganization to include Annexations to the City of Barstow and Odessa Water District, and Detachment from County Service Area 70 (Area B)
The Local Agency Formation Commission for San Bernardino County has received an application title above.
A. Notice of Filing Documents
Vicinity MapApplication and Preliminary Environmental Description FormAnnexation, Detachment, Reorganization Supplement FormLegal Description and MapsCity of Barstow Plan for Service and Overall Fiscal Impact AnalysisOdessa Water District Fiscal Impact Analysis and Plan for Service
B. Environmental Documents
Notice of Determination Dated June 17, 2026 and June 3, 2026Resolution 5256-2026 Certification of Final EIR, Adoption of CEQA Findings, Adoption of Statement of Overriding Considerations, and Adoption of Mitigation Monitoring and Reporting ProgramFinal EIR
FEIR 1.0 IntroductionFEIR 2.0a Comments and ResponsesFEIR 2.0b Comments and Response (Comment Letter O21)FEIR 3.0 Errata to the Draft EIRFEIR 3.0-1 & 3.0-2 Emission Errata and Thrasher ErrataFEIR 4.0 Mitigation Monitoring and Reporting ProgramsFEIR 5.0 Updates to the Final EIRDraft EIR
DEIR Cover and Table of Contents
DEIR 5.0 Environmental Analysis
DEIR 5.2 Agriculture and Forestry Resources
DEIR 5.7 Geology, Soils, and Mineral Resources
DEIR 5.8 Greenhouse Gas Emissions
DEIR 5.9 Hazards, Hazardous Materials, and Wildfire
DEIR 5.10 Hydrology and Water Quality
DEIR 5.11 Land Use and Planning
DEIR 5.13 Population and Housing
DEIR 5.14 Public Services and Recreation
DEIR 5.16 Tribal Cultural Resources
DEIR 5.17 Utilities and Service Systems
DEIR 7.0 Other CEQA Considerations
Draft EIR Appendices
Appendix 2 GP-1 NOP, NOP & Scoping Meeting Letters
Appendix 3 BIG-1 Barstow International Gateway SP - Final Draft
Appendix 3.0 GP-1 Proposed General Plan
Appendix 3.0 GP-2 Barstow Code, Title 19 Zoning Updates
Appendix 5.1 BIG-2 BIG Solar Farm Glare Study
Appendix 5.2 BIG-1 California LESA Model
Appendix 5.3 GP-1 Air Quality & Greenhouse Gas Emissions Modeling
Appendix 5.3 BIG-1 Air Quality Parts 1-8
Appendix 5.3 BIG-1 Air Quality Parts 9-18
Appendix 5.4 BIG-1 Biological Resources Part 1a
Appendix 5.4 BIG-1 Biological Resources Part 1b
Appendix 5.4 BIG-1 Biological Resources Part 1c
Appendix 5.4 BIG-1 Biological Resources Part 1d
Appendix 5.4 BIG-1 Biological Resources Part 1e
Appendix 5.4 BIG-1 Biological Resources Part 1f
Appendix 5.4 BIG-1 Biological Resources Part 1g
Appendix 5.4 BIG-1 Biological Resources Part 1h
Appendix 5.4 BIG-1 Biological Resources Part 2a
Appendix 5.4 BIG-1 Biological Resources Part 2b
Appendix 5.4 BIG-1 Biological Resources Part 2c
Appendix 5.4 BIG-1 Biological Resources Part 2d
Appendix 5.4 BIG-1 Biological Resources Part 2e
Appendix 5.4 BIG-1 Biological Resources Part 2f
Appendix 5.4 BIG-1 Biological Resources Part 2g
Appendix 5.4 BIG-1 Biological Resources Part 3a
Appendix 5.4 BIG-1 Biological Resources Part 3b
Appendix 5.4 BIG-1 Biological Resources Part 3c
Appendix 5.4 BIG-1 Biological Resources Part 3d
Appendix 5.4 BIG-1 Biological Resources Part 3e
Appendix 5.4 BIG-1 Biological Resources Part 3f
Appendix 5.4 BIG-1 Biological Resources Part 4a
Appendix 5.4 BIG-1 Biological Resources Part 4b
Appendix 5.4 BIG-1 Biological Resources Part 4c
Appendix 5.4 BIG-1 Biological Resources Part 4d
Appendix 5.4 BIG-1 Biological Resources Part 4e
Appendix 5.4 BIG-1 Biological Resources Part 4f
Appendix 5.4 BIG-1 Biological Resources Part 4g
Appendix 5.4 BIG-1 Biological Resources Part 5a
Appendix 5.4 BIG-1 Biological Resources Part 5b
Appendix 5.4 BIG-1 Biological Resources Part 5c
Appendix 5.4 BIG-1 Biological Resources Part 6
Appendix 5.5 BIG-1 NON-CONFIDENTIAL Cultural Resources Assessment
Appendix 5.6 GP-1 Energy Modeling
Appendix 5.6 BIG-1 Energy Assessment
Appendix 5.7 BIG-1 Geology Soils and Seismicity
Appendix 5.7 BIG-2 Mineral Resources
Appendix 5.7 BIG-3 Paleontological Resources Assessment
Appendix 5.8 BIG-1 Greenhouse Gas Emissions Assessment
Appendix 5.9 BIG-1 Hazardous Materials and Wastes Part 1
Appendix 5.9 BIG-1 Hazardous Materials and Wastes Part 2
Appendix 5.9 BIG-1 Hazardous Materials and Wastes Part 3
Appendix 5.9 BIG-1 Hazardous Materials and Wastes Part 4
Appendix 5.9 BIG-1 Hazardous Materials and Wastes Part 5
Appendix 5.9 BIG-1 Hazardous Materials and Wastes Part 6
Appendix 5.9 BIG-1 Hazardous Materials and Wastes Part 7
Appendix 5.9 BIG-1 Hazardous Materials and Wastes Part 8
Appendix 5.9 BIG-1 Hazardous Materials and Wastes Part 9
Appendix 5.9 BIG-1 Hazardous Materials and Wastes Part 10
Appendix 5.9 BIG-1 Hazardous Materials and Wastes Part 11
Appendix 5.10 BIG-1 Hydrology and Hydraulic Design
Appendix 5.11 GP-1 SBLAFCO CKH
Appendix 5.11 BIG-1 Economic and Fiscal Impact Analysis
Appendix 5.12 GP-1 Noise Monitoring and Modeling
Appendix 5.12 BIG-1 Noise and Vibration
Appendix 5.13 GP-1 Population, Housing, and Employment Projections Methodology
Appendix 5.14-1 Public Service Provider Questionnaires
Appendix 5.15 GP-1 Transportation Study
Appendix 5.15 BIG-1 CEQA Assessment - Transportation Analysis
Appendix 5.15 BIG-2 LOS Assessment - Transportation Analysis Part 1
Appendix 5.15 BIG-2 LOS Assessment - Transportation Analysis Part 2
Appendix 5.16 GP-1 Native American Heritage Commission Response
Appendix 5.16 GP-2 Tribal Correspondence Matrix
Appendix 5.17 GP-1 General Plan Infrastructure (Water, Sewer, Storm Drainage, and Water Quality)
Appendix 5.17 GP-2 Utility Service Provider Questionnaires
Appendix 5.17 BIG-1 Utility Assessment
Appendix 5.17 BIG-2 Water Supply Assessment
Appendix 5.17 BIG-3 Solar Farm Development Plan
